A Gatineau developer wants to construct a two-building project near Carleton University that would feature a 26-storey mixed-use highrise with a large student residence component.
In a recent planning application, Katasa Group says the development at the corner of Carling and Bronson avenues would be built in two phases, with the highrise constructed first, followed by another nine-storey apartment complex.
The 26-storey tower would include a four-storey podium with more than 80 rental units targeted at students and an additional 150 rental suites in the floors above.
OBJ360 (Sponsored)
Be a part of OBJ’s City Building 2024
Ottawa is undergoing a building boom that, as we speak, is shaping the future of the city. The cranes dotting Ottawa’s skyline are saluting the city’s transformation, with several megaprojects
Sidi.io draws VIP crowd at cheers and chats
You don’t always need to hit a business milestone to throw a really good party. That was the case on May 2, when digital marketing firm Sidi.io gathered its clients
The building would feature 7,500 square feet of amenity space such as a theatre room, study rooms, music rooms, lounges and a gym. The plan also calls for a small ground-floor retail space that’s expected to house a coffee shop.
Phase two of the project would be a nine-storey building fronting onto Cambridge Street that would include about 100 rental units. Both buildings would be served by a two-level underground garage with 174 parking spaces, including 22 for visitors.
The proposed highrise’s 82-metre height exceeds current zoning limits, which range from 11 metres to 30 metres depending on where the building is located. The builder is also requesting zoning relief to allow for decreased setbacks.