A local retirement home operator plans to more than double the size of its property in south Ottawa with the addition of a 14-storey highrise.
In a development application recently filed at City Hall, Waterford Senior Living says it wants to construct the 95,000-square-foot building next to its existing six-storey, 72,000-square-foot retirement home at 2431 Bank St. on the northeast corner of Bank Street and Hunt Club Road.
The new building, which will be attached to the current retirement residence by a one-storey walkway, will contain 144 one-and two-bedroom residential suites. Among the amenities proposed for the new residence are an indoor pool, multipurpose lounge, dining room and bar and a card lounge.
OBJ360 (Sponsored)

Sharing “PapaJo’s” story to shine the spotlight on the Campaign to Create Tomorrow
Visitors to the seventh floor of The Ottawa Hospital’s General campus may do a double take outside Room 7123. A plaque beside the door references “PapaJo” Johns. Who, you may

ExecHealth brings Canada’s leading advanced longevity program to National Capital Region
Ottawa’s ExecHealth was one of the first private clinics in Canada to provide personalized, ongoing primary care, having opened its doors 20 years ago this year. Now the pioneering local
In the application, Waterford says the development “aims to respond to an increasing demand for housing options for an aging population.”
The Ottawa-based company says the new suites will be “designed for independent living” and will be equipped with full kitchens. Residents will have access to prepared meals and assisted-living services as required in addition to a refurbished fitness room and wine bar in the neighbouring building.
The proposed addition will include two levels of underground parking with 133 spaces for residents, visitors and staff. About 50 of the existing 134 surface parking spots will be retained, while 12 new spaces will be added east of the new building for short-term parking.
The project will require council’s approval since the proposed tower slightly exceeds height and floor-plate limits under the current zoning. The site is also subject to a holding provision that will require certain design objectives to be met.