Health Canada is inviting contractors to bid to replace a roof on its laboratory centre for disease control building, with a maximum budget of $280,000.
The “roof membrane and wall cladding system” on block three of the facility must be replaced to “ensure the continued integrity of the roofing membrane” and to keep out moisture.
Details of the contract were posted on procurement site Merx, which is commonly used by the federal government.
OBJ360 (Sponsored)
How the uOttawa faculty of engineering instills an ‘entrepreneurial mindset’ in students
A decade ago, Terrafixing chief operating officer Vida Gabriel was a chemistry-loving student in high school with little to no interest in business or entrepreneurship. “I didn’t like the sales
The Ottawa Hospital’s Campaign to Create Tomorrow enters important next phase
For Ginger Bertrand, some of her earliest childhood memories in Ottawa are centred around healthcare. “I grew up across the street from what was originally the General Hospital,” she explains,
The building, constructed in 1954-5, is located in the Tunney’s Pasture complex at 100 Eglantine Driveway. The office space inside was renovated in the 1990s. Offices will be occupied during the renovation.
Contractors and subcontractors must have a minimum of five years’ experience and have completed at least two jobs “of a similar nature, size and scale.”
Bids are due Oct. 25. A mandatory site visit takes place Oct. 4.